Microsoft, Amazon Cloud Arms Set to Face Deeper Scrutiny Under EU’s Tech Rules
THE SO WHAT
EU designation of Azure and AWS under stricter Big Tech rules means your cloud stack is now entangled with a live regulatory experiment on interoperability, data access, and pricing. If you serve EU customers, pressure-test your portability story and contract terms — regulators may hand you leverage, but they’ll also raise your compliance floor.
READ THE SOURCE
MORE FROM THE WIRE
Tech & InnovationRivian’s R2 just helped it set a new sales record
A 45% YoY delivery jump to 19,000+ units says Rivian’s R2 is finally converting hype into throughput — the constraint is shifting from demand risk to execution risk on manufacturing and service. If you’re in the EV or charging ecosystem, assume Rivian volume is now a planning input, not a speculative upside case.
Tech & InnovationMy phone ran Skyrim at 60 fps, and it wasn’t even streaming
If a phone can run Skyrim at 60 fps natively, the performance gap between handheld and PC for many workloads — including on-device inference — is narrowing fast. Mobile product teams should be scoping what can move fully on-device over the next 12–24 months to cut latency and cloud cost.
Tech & InnovationSony has revealed its new QSSR upscaling tech for the base PS5, with tech analysts confirming an 'exceptional' quality boost for Marvel's Wolverine, while Ghost of Yotei 'saw less dramatic improvements'
Sony’s QSSR upscaling giving big wins on some titles and modest gains on others underscores that software-side image pipelines are now as important as raw GPU for perceived quality. Studios and engine teams need to treat vendor upscalers as first-class dependencies — and budget integration time accordingly.
Tech & InnovationRivian issues R2 recall for poorly tightened battery packs
A recall on just ~14 R2 vehicles for loose battery packs is tiny in volume but big in signal — early-stage EV manufacturing still lives and dies on process control. If you’re integrating with new OEMs, bake in higher QA, telemetry, and field-inspection overhead for at least the first 12–24 months of a new platform.